Skip to content

Dornick Point Wastewater Treatment Maintenance

Shaping the Future of johnstown, PA

Overview

Dornick Point Wastewater Treatment Maintenance

  1. TYM Tractor Purchase – Tractor purchased in November of 2024 for use at the Plant – loading and unloading, snow removal, miscellaneous tasks.
  2. Rotating Unit for Centrifuge – Rotating Assembly replacement.
  3. Grit Chamber Project – Rehabilitation of grit chamber system.

Project Gallery:

Back To Top